Case Studies
Housing Scheme Properties – Dewsbury
BRC worked on around 10 streets of Housing Scheme properties in Dewsbury, we carried out chemical cleaning and pointed all the stone fronts and brick rears and gables. We were sub contractors for this project and were on site for around 6 months.
Grantley Hall, near Ripon
BRC Leeds Ltd are proud to have been associated with the extensive restoration of the Grade II listed Grantley Hall. This 17th Century property has been renovated to an extremely high standard, following a multi million pound restoration project. BRC Leeds Ltd were on...
Leeds University The Wellbeing, Health and Safety Building
BRC cleaned and repaired this building and replaced all eroded bricks with replacement bricks carefully matched to the original.
Springhead Park House
Springhead Park House, Rothwell, is a stunning characterful residence on the edge of Springhead Park. BRC were involved in the chemical cleaning of the property. We fully repointed the building, carried out brick and stone repairs and sandblasted the painted areas of...
Semi Detached House, Rawden
This residence was chemically cleaned and re pointed. Chemical cleaning was selected as it is less detrimental than sandblasting (which would remove the face of the stone) and can still produce the desired results, as can be seen in the photograph.
Sycamore Place
This property was chemically cleaned and fully repointed with a lime mortar. BRC Leeds Ltd also carried out brick and stone repairs and brick replacement using reclaimed bricks to match the existing.
The New Hull Theatre
The New Hull Theatre has undergone a two year, £14 million intensive refurbishment programme. BRC carried out extensive remedial works to the Grade II Listed façade. We repaired the stone pillars and cracks to the stucco render.
Former Leeds Girls’ Grammar School
Stone repairs were carried out along with repointing to the chimneys. All the brickwork was chemically cleaned. Existing stone features were all sandblasted. We carried out stone replacement to all elevations. A previously internal gable, along with all stone...
Longley School
Now known as Woodley School & College. This was a major project we undertook in conjunction with Strategic Team Group and Kirklees Council. A mild acid was used to clean the surface of the building. The building was fully re-pointed. All joints were cut out by...